About The Project
Construction of a 50 lot subdivision over 3 stages. Works consisted of 15,000m3 of bulk earthworks, road construction on a highly reactive materal requiring a select layer, construction of a large and detailed detention basin consisting of 370m of retaining walls up to 1.5m high, concrete pathways and access ways, installation of all major utilities electrical, gas, NBN, sewer and water as well as a pumping station with sewer rising main.